The construction of a field hospital on any base is accompanied by the appearance of 1000 supplies in the built hospital. Other buildings are being built for this thousand. After that, the hospital is demolished, and the supplies spent on construction are returned for it. Next, the hospital is ordered again, and after it is built, 1000 supplies also appear in it, which can be spent on construction or equipment. Repeat the required number of times. You can endlessly.
Description
Description
Details
Details
- Severity
- None
- Resolution
- Open
- Reproducibility
- Always
- Operating System
- Windows 10
- Category
- General
Steps To Reproduce
- Build a field hospital. Get 1000 supplies in his storage.
- Order the project of the cheapest building. Cancel it. The supply pool at the base will be updated and will see a replenishment in the form of 1000 supplies in the hospital's storage
- Order all the necessary buildings. Transfer the remaining supplies to the storage of the command tent by ordering construction projects and then canceling orders.
- Demolish the field hospital. 300 supplies spent on its construction will be returned for it.
- Repeat starting from the first point.
Event Timeline
Comment Actions
Changed: US field hospital composition no longer contains a large amount of supplies
1.2.0.23
https://reforger.armaplatform.com/news/experimental-may-23-2024